United States βΊ Power plants βΊ Solar farms βΊ New York
SOLAR FARMSCavern
Cavern is a 2.0 MW planned solar farm in Clinton County, New York, operated by Cavern Solar, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV1 | Solar Photovoltaic | 2.0 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Cavern Solar, LLC
- Location
- Clinton County, New York
- Balancing authority
- NYIS
- Sector
- IPP Non-CHP
- Capacity
- Planned: 2.0 MW
- EIA plant ID
- 68858
Location
44.7116, -73.5413
Nearby power plants
- Kent FallsHydroelectric plants Β· 9.2 MW Β· 2.8 mi
- Clinton LFGTE FacilityBioenergy plants Β· 6.4 MW Β· 2.9 mi
- Lower Saranac Hydroelectric FacilityHydroelectric plants Β· 6.7 MW Β· 3.4 mi
- Mill CHydroelectric plants Β· 6.0 MW Β· 3.6 mi
- Route 22 Community Solar Farm CSGSolar farms Β· 3.7 MW Β· 3.8 mi
- CadyvilleHydroelectric plants Β· 5.5 MW Β· 4.1 mi
- Saranac FacilityGas power plants Β· 286 MW Β· 4.2 mi
- AltonaWind farms Β· 97.5 MW Β· 9.3 mi
- NY ALTONA MAYOTT - Environomics P1Solar farms Β· 5.0 MW Β· 11.7 mi
- NY ALTONA MAYOTT - Environomics P2Solar farms Β· 5.0 MW Β· 11.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem