🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Bioenergy plants › California

BIOENERGY PLANTS

Tracy Renewable Power Plant

Tracy Renewable Power Plant is a 5.0 MW under construction bioenergy plant in San Joaquin County, California, operated by Tracy Renewable Energy, LLC.

Plant statusUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingTarget Feb 2027 (not yet reached)
  5. Closed (not yet reached)

Planned start of operation reported to EIA: Feb 2027.

Open in Google MapsMore bioenergy plants in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
TRP01Other Waste Biomass5.0 MW Under construction (up to 50%)Target Feb 2027

Plant details

Operator
Tracy Renewable Energy, LLC
Location
San Joaquin County, California
Balancing authority
CISO
Sector
IPP Non-CHP
Capacity
Under construction: 5.0 MW
EIA plant ID
68855

Location

37.7716, -121.4251

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem