United States › Power plants › Solar farms › Arizona
SOLAR FARMS · BATTERY STORAGEPioneer Clean Energy Center
Pioneer Clean Energy Center is a 600 MW under construction solar and battery storage plant in Yuma County, Arizona, operated by Yuma bn, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Apr 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Apr 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| ORCH1 | Solar Photovoltaic | 300 MW | Under construction (up to 50%) |
| ORCH2 | Batteries | 300 MW | Under construction (up to 50%) |
Plant details
- Operator
- Yuma bn, LLC
- Location
- Yuma County, Arizona
- Balancing authority
- AZPS
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 600 MW
- EIA plant ID
- 68328
Location
32.5491, -114.5974
Nearby power plants
- Arizona Western College PVSolar farms · 4.7 MW · 11.3 mi
- Yuma Solar + StorageSolar farms, Battery storage · 140 MW · 11.7 mi
- Foothills Solar Plant HybridSolar farms, Battery storage · 73.0 MW · 12.0 mi
- Yuma Cogeneration AssociatesGas power plants · 62.6 MW · 12.8 mi
- YuccaGas power plants, Oil-fired power plants · 422 MW · 13.6 mi
- Pilot KnobHydroelectric plants · 33.0 MW · 14.6 mi
- Siphon Drop Power PlantHydroelectric plants · 4.4 MW · 16.0 mi
- Drop 1Hydroelectric plants · 5.7 MW · 23.0 mi
- Drop 2 (CA)Hydroelectric plants · 10.0 MW · 27.4 mi
- Drop 3 (CA)Hydroelectric plants · 9.2 MW · 32.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem