🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › Texas

SOLAR FARMS

Walleye Solar (Sandow II)

Walleye Solar (Sandow II) is a 369 MW cancelled solar farm in Milam County, Texas, operated by EDF Renewable Asset Holdings, Inc..

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
SDTWOSolar Photovoltaic369 MW Cancelled or postponed

Plant details

Operator
EDF Renewable Asset Holdings, Inc.
Location
Milam County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Cancelled: 369 MW
EIA plant ID
68231

Location

30.5693, -97.0857

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem