United States › Power plants › Battery storage › Texas
BATTERY STORAGEPecan BESS
Pecan BESS is a 157 MW planned battery storage site in Leon County, Texas, operated by Gransolar Texas Three, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GRS3 | Batteries | 157 MW | Regulatory approvals pending |
Plant details
- Operator
- Gransolar Texas Three, LLC
- Location
- Leon County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 157 MW
- EIA plant ID
- 67774
Location
31.0787, -96.2233
Nearby power plants
- Pecan Prairie South SolarSolar farms · 133 MW · 2.0 mi
- Pecan Prairie North SolarSolar farms · 324 MW · 4.9 mi
- Hollow Branch CreekSolar farms · 460 MW · 10.0 mi
- SOSA Energy CenterBattery storage · 156 MW · 13.7 mi
- Tex-Bar ESSBattery storage · 200 MW · 15.3 mi
- Diver Solar, LLCSolar farms · 225 MW · 15.4 mi
- Oak Grove (TX)Coal power plants · 1,795 MW · 17.1 mi
- Kahla StorageBattery storage · 201 MW · 17.2 mi
- LimestoneCoal power plants · 1,850 MW · 23.8 mi
- Tidwell Prairie Storage 1Battery storage · 200 MW · 26.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem