United States › Power plants › Solar farms › California
SOLAR FARMSNorth Kern Water Storage District 1
North Kern Water Storage District 1 is a 2.5 MW cancelled solar farm in Kern County, California, operated by EFR Solar, LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 18993 | Solar Photovoltaic | 2.5 MW | Cancelled or postponed |
Plant details
- Operator
- EFR Solar, LLC
- Location
- Kern County, California
- Balancing authority
- CISO
- Sector
- Commercial Non-CHP
- Capacity
- Cancelled: 2.5 MW
- EIA plant ID
- 67607
Location
35.4691, -119.1690
Nearby power plants
- North Kern 1Solar farms · 2.5 MW · 0.0 mi
- North Kern 2Solar farms · 2.5 MW · 0.9 mi
- Broadway 4 - Target ShafterSolar farms · 1.6 MW · 1.2 mi
- Imperator SolarSolar farms · 2.0 MW · 1.7 mi
- Sun Pacific - LerdoSolar farms · 2.9 MW · 2.5 mi
- Lerdo MiddleSolar farms · 2.4 MW · 2.6 mi
- Ranch 3461Solar farms · 2.8 MW · 3.3 mi
- Lerdo EastSolar farms · 1.5 MW · 3.4 mi
- Frontier HS Solar ProjectSolar farms · 1.4 MW · 3.7 mi
- Lerdo Detention Facility - Solar 2, 3Solar farms · 5.2 MW · 4.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem