United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSCallan Solar
Callan Solar is a 90.0 MW planned solar farm in McCulloch County, Texas, operated by RIC Development, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Apr 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| RIC93 | Solar Photovoltaic | 90 MW | Planned, approvals not yet sought |
Plant details
- Operator
- RIC Development, LLC
- Location
- McCulloch County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 90.0 MW
- EIA plant ID
- 67561
Location
30.9909, -99.6012
Nearby power plants
- LampwickSolar farms Β· 7.5 MW Β· 9.0 mi
- Heart of Texas Wind ProjectWind farms Β· 180 MW Β· 20.4 mi
- Maverick Creek WindWind farms Β· 492 MW Β· 23.6 mi
- Rattlesnake Power, LLCWind farms Β· 160 MW Β· 25.7 mi
- Cactus Flats Wind Energy ProjectWind farms Β· 148 MW Β· 26.6 mi
- Regis MasonBattery storage Β· 9.9 MW Β· 28.0 mi
- Bat CaveBattery storage Β· 100 MW Β· 28.0 mi
- Galloway 1 Solar FarmSolar farms Β· 250 MW Β· 32.8 mi
- Junction BESSBattery storage Β· 9.9 MW Β· 34.2 mi
- Junction (TX)Battery storage Β· 9.9 MW Β· 35.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem