United States › Power plants › Battery storage › Texas
BATTERY STORAGESerrano BESS
Serrano BESS is a 186 MW planned battery storage site in Maverick County, Texas, operated by RIC Development, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Apr 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| RIC97 | Batteries | 186 MW | Planned, approvals not yet sought |
Plant details
- Operator
- RIC Development, LLC
- Location
- Maverick County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 186 MW
- EIA plant ID
- 67556
Location
28.8379, -100.5487
Nearby power plants
- Eagle PassHydroelectric plants · 9.6 MW · 0.6 mi
- Regis EscondidoBattery storage · 9.9 MW · 8.7 mi
- WAL461Gas power plants · 1.2 MW · 10.2 mi
- Pueblo BABattery storage · 19.8 MW · 12.1 mi
- Fort Duncan BESSBattery storage · 103 MW · 13.0 mi
- Anacacho Wind Farm, LLCWind farms · 99.8 MW · 34.2 mi
- OCI Alamo 4, LLCSolar farms · 39.6 MW · 35.3 mi
- Zier SolarSolar farms, Battery storage · 200 MW · 35.5 mi
- Cairos Solar and StorageSolar farms, Battery storage · 231 MW · 36.6 mi
- Despain SolarSolar farms · 236 MW · 36.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem