United States › Power plants › Battery storage › Texas
BATTERY STORAGEIron Belt
Iron Belt is a 400 MW planned battery storage site in Borden County, Texas, operated by Iron Belt Energy Storage Project, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Jun 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Batteries | 400 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Iron Belt Energy Storage Project, LLC
- Location
- Borden County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 400 MW
- EIA plant ID
- 67059
Location
32.5557, -101.6601
Nearby power plants
- Mesquite Creek WindWind farms · 211 MW · 11.0 mi
- Borden County BESSBattery storage · 150 MW · 11.6 mi
- Uva Creek SolarSolar farms · 301 MW · 12.5 mi
- ENGIE Long Draw Solar LLCSolar farms · 225 MW · 13.0 mi
- Gail Mountain SolarSolar farms · 244 MW · 13.4 mi
- Lamesa IISolar farms · 50.0 MW · 17.0 mi
- Lamesa SolarSolar farms · 102 MW · 19.0 mi
- Al Pastor Battery Storage PlantBattery storage · 100 MW · 19.6 mi
- Juno Solar ProjectSolar farms · 306 MW · 21.7 mi
- Highpeak Solar 1Solar farms · 10.0 MW · 22.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem