United States › Power plants › Battery storage › California
BATTERY STORAGEElevate Pier S
Elevate Pier S is a 70.0 MW planned battery storage site in Los Angeles County, California, operated by Lighthouse Pier S, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| ELVPS | Batteries | 70 MW | Regulatory approvals pending |
Plant details
- Operator
- Lighthouse Pier S, LLC
- Location
- Los Angeles County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 70.0 MW
- EIA plant ID
- 66787
Location
33.7650, -118.2237
Nearby power plants
- Long Beach GenerationGas power plants · 252 MW · 0.1 mi
- THUMSGas power plants · 57.4 MW · 0.6 mi
- Harbor CogenGas power plants · 107 MW · 0.9 mi
- Toyota Long Beach TrigenBioenergy plants · 2.8 MW · 1.1 mi
- Valero Wilmington Cogeneration PlantGas power plants · 33.5 MW · 1.3 mi
- Wilmington Hydrogen PlantOther power plants · 31.9 MW · 1.4 mi
- Cathode (Hinson) BESSBattery storage · 200 MW · 1.6 mi
- Linde WilmingtonGas power plants · 31.0 MW · 1.7 mi
- Long Beach Convention CenterBattery storage · 1.5 MW · 2.0 mi
- HarborGas power plants · 548 MW · 2.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem