πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms β€Ί Arizona

SOLAR FARMS

Raptor Ridge

Raptor Ridge is a 12.5 MW operating solar farm in Pima County, Arizona, operated by Tucson Electric Power Co.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2022 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore solar farms in Arizona

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
RRSSolar Photovoltaic13 MW OperatingJun 2022

Plant details

Operator
Tucson Electric Power Co
Location
Pima County, Arizona
Balancing authority
TEPC
Sector
Industrial Non-CHP
Capacity
Operating: 12.5 MW
First unit online
Jun 2022
EIA plant ID
65972

Location

32.1469, -110.8781

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem