United States › Power plants › Battery storage › Texas
BATTERY STORAGEElio Energy LLC
Elio Energy LLC is a 300 MW planned battery storage site in Brazoria County, Texas, operated by Elio Energy LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027. This plant has generators at more than one stage; see the table below.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| ELIBS | Batteries | 300 MW | Planned, approvals not yet sought |
| ELIPV | Solar Photovoltaic | 160 MW | Cancelled or postponed |
Plant details
- Operator
- Elio Energy LLC
- Location
- Brazoria County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 300 MW
Cancelled: 160 MW - EIA plant ID
- 65850
Location
29.2477, -95.6855
Nearby power plants
- Long Point SolarSolar farms · 120 MW · 0.6 mi
- WagyuSolar farms · 120 MW · 1.7 mi
- Brazoria WestSolar farms · 200 MW · 4.1 mi
- Nash SolarSolar farms · 10.0 MW · 5.4 mi
- TX23 Roughneck StorageBattery storage · 50.0 MW · 6.3 mi
- Second Division SolarSolar farms, Battery storage · 130 MW · 6.3 mi
- Brazoria County Solar Project (Danciger)Solar farms · 200 MW · 6.6 mi
- CastorBattery storage · 200 MW · 7.0 mi
- Prospect StorageBattery storage · 9.9 MW · 7.1 mi
- Bell Creek BESS LLCBattery storage · 201 MW · 7.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem