United States βΊ Power plants βΊ Solar farms βΊ Florida
SOLAR FARMSJuniper Solar (FL)
Juniper Solar (FL) is a 70.0 MW operating solar farm in Pasco County, Florida, operated by Tampa Electric Co.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Solar Photovoltaic | 70 MW |
Plant details
- Operator
- Tampa Electric Co
- Location
- Pasco County, Florida
- Balancing authority
- TEC
- Sector
- Electric Utility
- Capacity
- Operating: 70.0 MW
- First unit online
- Dec 2023
- EIA plant ID
- 65683
Location
28.1816, -82.1553
Nearby power plants
- LKL BLBD, LLCSolar farms Β· 6.0 MW Β· 11.6 mi
- WinstonOil-fired power plants Β· 50.0 MW Β· 13.6 mi
- Lakeland Electric Co. (FL) - Airport IISolar farms Β· 3.5 MW Β· 14.7 mi
- Lakeland Electric Co. (FL)-Airport 1Solar farms Β· 2.3 MW Β· 14.9 mi
- GoldfinchSolar farms Β· 3.0 MW Β· 15.4 mi
- Mountain View Solar (FL)Solar farms Β· 54.6 MW Β· 15.5 mi
- C D McIntosh JrGas power plants, Oil-fired power plants Β· 667 MW Β· 15.8 mi
- Dover Solar and Battery StorageSolar farms, Battery storage Β· 40.0 MW Β· 15.8 mi
- Larsen MemorialGas power plants Β· 111 MW Β· 16.8 mi
- English Creek SolarSolar farms Β· 23.0 MW Β· 17.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem