🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage › North Carolina

BATTERY STORAGE

Riverside BESS

Riverside BESS is a 5.0 MW cancelled battery storage site in Buncombe County, North Carolina, operated by Duke Energy Progress - (NC).

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore battery storage sites in North Carolina

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
ES1Batteries5.0 MW Cancelled or postponed

Plant details

Operator
Duke Energy Progress - (NC)
Location
Buncombe County, North Carolina
Balancing authority
CPLW
Sector
Electric Utility
Capacity
Cancelled: 5.0 MW
EIA plant ID
65126

Location

35.6423, -82.5973

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem