United States › Power plants › Solar farms › California
SOLAR FARMS · BATTERY STORAGECounty of San Diego COC Hybrid
County of San Diego COC Hybrid is a 2.1 MW operating solar and battery storage plant in San Diego County, California, operated by Solar Star California LXXVIII, LLC. Its batteries store up to 1 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV | Solar Photovoltaic | 1.7 MW | |
| ESS | Batteries | 0.4 MW 1 MWh |
Plant details
- Operator
- Solar Star California LXXVIII, LLC
- Location
- San Diego County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 2.1 MW
- First unit online
- Jul 2020
- EIA plant ID
- 64601
Location
32.8336, -117.1311
Nearby power plants
- Kearny South Energy StorageBattery storage · 10.0 MW · 0.1 mi
- Kearny North Energy StorageBattery storage · 10.0 MW · 0.2 mi
- L3 Harris San DiegoSolar farms · 1.6 MW · 0.8 mi
- Kyocera International Inc.(San Diego)Gas power plants · 3.8 MW · 1.1 mi
- Kearny Mesa Storage LLCBattery storage · 1.0 MW · 1.3 mi
- EnerSmart Mesa Heights Sub StationBattery storage · 3.0 MW · 1.3 mi
- MM San Diego-MiramarBioenergy plants · 7.3 MW · 2.0 mi
- Childrens HospitalGas power plants, Oil-fired power plants · 11.3 MW · 2.7 mi
- Elliott Energy StorageBattery storage · 10.0 MW · 2.7 mi
- San Diego Community CollegeGas power plants · 1.0 MW · 2.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem