United States › Power plants › Solar farms › New Hampshire
SOLAR FARMSMerrimack Solar Farm, LLC
Merrimack Solar Farm, LLC is a 2.4 MW operating solar farm in Hillsborough County, New Hampshire, operated by Merrimack Solar Farm.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV1 | Solar Photovoltaic | 2.4 MW |
Plant details
- Operator
- Merrimack Solar Farm
- Location
- Hillsborough County, New Hampshire
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
- Capacity
- Operating: 2.4 MW
- First unit online
- Jan 2019
- EIA plant ID
- 64454
Location
42.8114, -71.5012
Nearby power plants
- Mine Falls Generating StationHydroelectric plants · 3.0 MW · 4.2 mi
- Nashua PlantBioenergy plants · 2.4 MW · 5.6 mi
- Granite RidgeGas power plants · 790 MW · 7.5 mi
- Blodgett Solar CSGSolar farms, Battery storage · 10.0 MW · 9.6 mi
- Dunstable Solar 1, LLCSolar farms, Battery storage · 9.0 MW · 10.1 mi
- Tyngsborough SolarSolar farms · 2.6 MW · 10.2 mi
- Pepperell Hydro Power PlantHydroelectric plants · 2.2 MW · 10.5 mi
- Westford Solar ParkSolar farms · 4.0 MW · 12.8 mi
- BWC Stony Brook, LLC HybridSolar farms, Battery storage · 2.3 MW · 13.0 mi
- AmoskeagHydroelectric plants · 16.0 MW · 13.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem