United States › Power plants › Solar farms › California
SOLAR FARMSAmazon - Stockton - Roof (SCK1) - (CA)
Amazon - Stockton - Roof (SCK1) - (CA) is a 2.6 MW operating solar farm in San Joaquin County, California, operated by Forefront Power, LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 19001 | Solar Photovoltaic | 2.6 MW |
Plant details
- Operator
- Forefront Power, LLC
- Location
- San Joaquin County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 2.6 MW
- First unit online
- Mar 2023
- EIA plant ID
- 64429
Location
37.9117, -121.1987
Nearby power plants
- Donaghy-StocktonSolar farms · 1.1 MW · 0.3 mi
- Ameresco ForwardBioenergy plants · 4.4 MW · 2.1 mi
- Cascade Energy Storage, LLCBattery storage · 25.0 MW · 2.3 mi
- Stockton 1 - slcva801Solar farms · 1.0 MW · 2.5 mi
- Niagara Bottling StocktonSolar farms · 1.0 MW · 3.0 mi
- Stockton 6 - SLEBA202Solar farms · 1.1 MW · 3.5 mi
- Stockton 9 - slcva209Solar farms · 1.0 MW · 3.9 mi
- Manteca Land PVSolar farms · 1.0 MW · 5.0 mi
- Regional Wastewater Control FacilityBioenergy plants, Oil-fired power plants · 7.8 MW · 7.3 mi
- Stockton BiomassBioenergy plants · 54.0 MW · 7.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem