United States βΊ Power plants βΊ Solar farms βΊ California
SOLAR FARMSGrape
Grape is a 246 MW under construction solar farm in Kings County, California, operated by Westlands Grape, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Mar 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Mar 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GRAPE | Solar Photovoltaic | 246 MW | Under construction (over 50%) |
Plant details
- Operator
- Westlands Grape, LLC
- Location
- Kings County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 246 MW
- EIA plant ID
- 63851
Location
36.1457, -119.9051
Nearby power plants
- ChestnutSolar farms, Battery storage Β· 286 MW Β· 1.0 mi
- CherrySolar farms, Battery storage Β· 400 MW Β· 1.9 mi
- Solar BlueSolar farms, Battery storage Β· 475 MW Β· 2.0 mi
- AquamarineSolar farms Β· 250 MW Β· 3.0 mi
- AlmondSolar farms Β· 19.9 MW Β· 4.6 mi
- Mustang TwoSolar farms Β· 150 MW Β· 4.9 mi
- Westside Solar Power PV1Solar farms Β· 2.0 MW Β· 5.1 mi
- RE Mustang LLCSolar farms, Battery storage Β· 175 MW Β· 5.3 mi
- RE Kent South, LLCSolar farms Β· 20.0 MW Β· 5.6 mi
- Slate HybridSolar farms, Battery storage Β· 440 MW Β· 5.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem