United States βΊ Power plants βΊ Battery storage βΊ Nevada
BATTERY STORAGE Β· SOLAR FARMSArida Solar (Hybrid)
Arida Solar (Hybrid) is a 740 MW planned power plant in Clark County, Nevada, operated by 326FW 8me LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2029 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Jun 2029.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BESS | Batteries | 370 MW | Planned, approvals not yet sought |
| ARIDA | Solar Photovoltaic | 370 MW | Planned, approvals not yet sought |
Plant details
- Operator
- 326FW 8me LLC
- Location
- Clark County, Nevada
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 740 MW
- EIA plant ID
- 63841
Location
35.0920, -114.6888
Nearby power plants
- Davis DamHydroelectric plants Β· 255 MW Β· 9.9 mi
- Mohave Energy - HybridSolar farms, Battery storage Β· 32.6 MW Β· 10.5 mi
- Mohave Electric at Fort MohaveSolar farms Β· 4.4 MW Β· 10.6 mi
- Mohave Electric Cooperative at Joy LaneSolar farms, Battery storage Β· 25.9 MW Β· 10.6 mi
- Mohave Energy ParkGas power plants Β· 242 MW Β· 13.6 mi
- South Point Energy CenterGas power plants Β· 708 MW Β· 17.9 mi
- Black Mountain Solar LLCSolar farms Β· 9.0 MW Β· 30.1 mi
- Black Mountain Generating StationGas power plants Β· 121 MW Β· 30.2 mi
- Searchlight SolarSolar farms Β· 17.5 MW Β· 30.2 mi
- Griffith Energy LLCGas power plants Β· 655 MW Β· 31.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem