🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › California

SOLAR FARMS

Camino Solar Hybrid

Camino Solar Hybrid is a 44.0 MW operating solar farm in Kern County, California, operated by Avangrid Power LLC.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingApr 2025 (current stage)
  5. Closed (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore solar farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
CSPV1Solar Photovoltaic44 MW OperatingApr 2025
CSBA1Batteries11 MW Cancelled or postponed

Plant details

Operator
Avangrid Power LLC
Location
Kern County, California
Balancing authority
CISO
Sector
IPP Non-CHP
Capacity
Operating: 44.0 MW
Cancelled: 11.0 MW
First unit online
Apr 2025
EIA plant ID
63508

Location

34.9303, -118.4432

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem