United States › Power plants › Solar farms › North Carolina
SOLAR FARMSShakespeare Solar
Shakespeare Solar is a 5.0 MW cancelled solar farm in Rutherford County, North Carolina, operated by Shakespeare Solar, LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PGR12 | Solar Photovoltaic | 5.0 MW | Cancelled or postponed |
Plant details
- Operator
- Shakespeare Solar, LLC
- Location
- Rutherford County, North Carolina
- Balancing authority
- DUK
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 5.0 MW
- EIA plant ID
- 63014
Location
35.3019, -81.8640
Nearby power plants
- Clear Solar I, LLCSolar farms · 3.6 MW · 1.3 mi
- Old Caroleen Solar FarmSolar farms · 2.0 MW · 2.9 mi
- Rutherford FarmSolar farms · 74.8 MW · 3.6 mi
- Charlotte SolarSolar farms · 5.0 MW · 3.7 mi
- Amethyst SolarSolar farms · 3.0 MW · 3.7 mi
- Gamble SolarSolar farms · 3.0 MW · 4.1 mi
- Bostic Delivery No 2Oil-fired power plants · 1.0 MW · 4.5 mi
- Innovative Solar 15, LLCSolar farms · 2.0 MW · 5.8 mi
- Ruff Solar LLCSolar farms · 22.0 MW · 5.8 mi
- Lincoln Solar, LLC (NC)Solar farms · 4.9 MW · 6.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem