United States › Power plants › Wind farms › Texas
WIND FARMSBuenos Aires Phase 1
Buenos Aires Phase 1 is a 200 MW cancelled wind farm in Hidalgo County, Texas, operated by Buenos Aires Windpower LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BAW1 | Onshore Wind Turbine | 200 MW | Cancelled or postponed |
Plant details
- Operator
- Buenos Aires Windpower LLC
- Location
- Hidalgo County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 200 MW
- EIA plant ID
- 62803
Location
26.6495, -98.1238
Nearby power plants
- Red Gate Power PlantGas power plants · 224 MW · 14.1 mi
- Monte Cristo 1Wind farms · 239 MW · 16.4 mi
- Alexis Solar, LLCSolar farms · 10.0 MW · 17.9 mi
- West Raymond Wind Farm LLCWind farms · 240 MW · 20.5 mi
- North Edinburg BESS 1Battery storage · 10.0 MW · 21.3 mi
- Hidalgo Energy CenterGas power plants · 551 MW · 21.5 mi
- Magic Valley Generating StationGas power plants · 801 MW · 21.8 mi
- Hidalgo Wind Farm LLCWind farms · 250 MW · 21.8 mi
- Hidalgo Wind Farm IIWind farms · 50.4 MW · 22.8 mi
- Gunnar Reliability ProjectBattery storage · 150 MW · 23.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem