United States βΊ Power plants βΊ Solar farms βΊ Colorado
SOLAR FARMSMesa CSG 2 Massicotte
Mesa CSG 2 Massicotte is a 1.5 MW operating solar farm in Mesa County, Colorado, operated by Standard Solar.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| X0037 | Solar Photovoltaic | 1.5 MW |
Plant details
- Operator
- Standard Solar
- Location
- Mesa County, Colorado
- Balancing authority
- PSCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 1.5 MW
- First unit online
- May 2019
- EIA plant ID
- 62718
Location
39.0448, -108.4197
Nearby power plants
- Pivot Solar 57 LLCSolar farms Β· 2.0 MW Β· 1.8 mi
- USS Fruita Solar LLC CSGSolar farms Β· 2.0 MW Β· 3.3 mi
- Mesa PV1Solar farms Β· 1.6 MW Β· 5.0 mi
- Vinelands Power PlantHydroelectric plants Β· 4.5 MW Β· 5.6 mi
- Oak Leaf Solar XXXI LLC (CSG)Solar farms Β· 1.5 MW Β· 8.7 mi
- Redlands Water & PowerHydroelectric plants Β· 1.4 MW Β· 9.4 mi
- Mesa CSG 1 MurdockSolar farms Β· 1.5 MW Β· 12.8 mi
- FruitaGas power plants Β· 26.6 MW Β· 18.0 mi
- Grand Valley Solar Generation and BESSSolar farms, Battery storage Β· 200 MW Β· 22.1 mi
- Lower MolinaHydroelectric plants Β· 5.6 MW Β· 22.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem