United States βΊ Power plants βΊ Oil-fired power plants βΊ Wisconsin
OIL-FIRED POWER PLANTS Β· SOLAR FARMSEpic Verona
Epic Verona is a 46.4 MW operating power plant in Dane County, Wisconsin, operated by Epic Hosting, LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV | Solar Photovoltaic | 2.7 MW | |
| G101 | Petroleum Liquids | 2.3 MW | |
| G102 | Petroleum Liquids | 2.3 MW | |
| G103 | Petroleum Liquids | 2.3 MW | |
| G104 | Petroleum Liquids | 2.3 MW | |
| G105 | Petroleum Liquids | 2.3 MW | |
| G202 | Petroleum Liquids | 2.3 MW | |
| G203 | Petroleum Liquids | 2.3 MW | |
| G204 | Petroleum Liquids | 2.3 MW | |
| G205 | Petroleum Liquids | 2.3 MW | |
| G206 | Petroleum Liquids | 2.3 MW | |
| G207 | Petroleum Liquids | 2.3 MW | |
| G208 | Petroleum Liquids | 2.3 MW | |
| G209 | Petroleum Liquids | 2.3 MW | |
| G210 | Petroleum Liquids | 2.3 MW | |
| G211 | Petroleum Liquids | 2.3 MW | |
| G301 | Petroleum Liquids | 2.3 MW | |
| G302 | Petroleum Liquids | 2.3 MW | |
| G303 | Petroleum Liquids | 2.3 MW | |
| G304 | Petroleum Liquids | 2.3 MW |
Plant details
- Operator
- Epic Hosting, LLC
- Location
- Dane County, Wisconsin
- Balancing authority
- MISO
- Sector
- Commercial Non-CHP
- Capacity
- Operating: 46.4 MW
- First unit online
- Jun 2009
- EIA plant ID
- 62676
Location
42.9968, -89.5688
Nearby power plants
- O'Brien Solar FieldsSolar farms Β· 22.1 MW Β· 5.5 mi
- FitchburgGas power plants Β· 57.6 MW Β· 5.6 mi
- Pine Hill SolarSolar farms Β· 6.0 MW Β· 6.4 mi
- West Middleton BESSBattery storage Β· 7.0 MW Β· 6.7 mi
- Sunnyside Solar Energy CenterSolar farms, Battery storage Β· 60.0 MW Β· 6.8 mi
- Middleton Airport SolarSolar farms Β· 5.6 MW Β· 8.5 mi
- Middleton Biogas Solar, LLCSolar farms, Battery storage Β· 2.2 MW Β· 8.8 mi
- Strix SolarSolar farms Β· 6.0 MW Β· 9.0 mi
- West Campus Cogeneration FacilityGas power plants Β· 169 MW Β· 9.0 mi
- Tyto SolarSolar farms Β· 6.0 MW Β· 9.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem