United States › Power plants › Hydroelectric plants › Pennsylvania
HYDROELECTRIC PLANTSAllegheny L&D2 Hydroelectric Project
Allegheny L&D2 Hydroelectric Project is a 9.0 MW planned hydroelectric plant in Allegheny County, Pennsylvania, operated by Rye Development.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2030 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2030.
Open in Google MapsMore hydroelectric plants in Pennsylvania
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| NA1 | Conventional Hydroelectric | 4.5 MW | Planned, approvals not yet sought |
| NA2 | Conventional Hydroelectric | 4.5 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Rye Development
- Location
- Allegheny County, Pennsylvania
- Balancing authority
- PJM
- Sector
- IPP Non-CHP
- Capacity
- Planned: 9.0 MW
- EIA plant ID
- 62401
Location
40.8944, -79.9136
Nearby power plants
- Allegheny Hydro No 9Hydroelectric plants · 17.8 MW · 19.4 mi
- Allegheny No. 5 Hydro StationHydroelectric plants · 9.2 MW · 19.6 mi
- Allegheny No 6 Hydro StationHydroelectric plants · 9.2 MW · 21.5 mi
- Wabtec U.S Rail, Grove City Engine PlantOil-fired power plants · 4.4 MW · 21.5 mi
- Allegheny Lock and Dam 4Hydroelectric plants · 6.4 MW · 21.9 mi
- Allegheny Hydro No 8Hydroelectric plants · 13.6 MW · 22.7 mi
- Beaver Valley Patterson DamHydroelectric plants · 0.8 MW · 23.6 mi
- Townsend HydroHydroelectric plants · 5.2 MW · 23.7 mi
- New Castle PlantGas power plants, Oil-fired power plants · 351 MW · 24.0 mi
- CW Bill Young Hydropower ProjectHydroelectric plants · 8.4 MW · 25.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem