United States › Power plants › Wind farms › Wyoming
WIND FARMSBoswell Wind II
Boswell Wind II is a 80.0 MW cancelled wind farm in Albany County, Wyoming, operated by Boswell Wind Project II, LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BOSW2 | Onshore Wind Turbine | 80 MW | Cancelled or postponed |
Plant details
- Operator
- Boswell Wind Project II, LLC
- Location
- Albany County, Wyoming
- Balancing authority
- PACE
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 80.0 MW
- EIA plant ID
- 61394
Location
41.8690, -105.8320
Nearby power plants
- Boswell WindWind farms · 330 MW · 3.9 mi
- McFadden RidgeWind farms · 35.2 MW · 12.9 mi
- High PlainsWind farms · 122 MW · 16.3 mi
- Two Rivers Wind FacilityWind farms · 6.1 MW · 19.4 mi
- DunlapWind farms · 130 MW · 20.7 mi
- Rock Creek WindWind farms · 590 MW · 23.5 mi
- Foote Creek RimWind farms · 135 MW · 25.3 mi
- Ekola FlatsWind farms · 251 MW · 27.4 mi
- Seven Mile HillWind farms · 146 MW · 28.2 mi
- TB FlatsWind farms · 503 MW · 29.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem