United States βΊ Power plants βΊ Solar farms βΊ California
SOLAR FARMSIntel Folsom Phase 3
Intel Folsom Phase 3 is a 5.2 MW operating solar farm in Sacramento County, California, operated by Tesla Inc..
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV1 | Solar Photovoltaic | 5.2 MW |
Plant details
- Operator
- Tesla Inc.
- Location
- Sacramento County, California
- Balancing authority
- BANC
- Sector
- IPP Non-CHP
- Capacity
- Operating: 5.2 MW
- First unit online
- Apr 2016
- EIA plant ID
- 61152
Location
38.6460, -121.1626
Nearby power plants
- Intel Folsom Phase 2Solar farms Β· 1.0 MW Β· 0.2 mi
- Intel FolsomSolar farms Β· 1.0 MW Β· 0.6 mi
- Aerojet ISolar farms Β· 3.0 MW Β· 2.2 mi
- Aerojet IISolar farms Β· 2.2 MW Β· 2.6 mi
- Folsom SP and CSP SacramentoSolar farms Β· 1.3 MW Β· 2.8 mi
- NimbusHydroelectric plants Β· 13.4 MW Β· 3.2 mi
- FolsomHydroelectric plants Β· 199 MW Β· 4.2 mi
- Blue Shld Of Cal- El Dorado Hlls Mtr BSolar farms Β· 1.5 MW Β· 4.8 mi
- Sacramento Valley Energy Center, LLCSolar farms, Battery storage Β· 300 MW Β· 5.3 mi
- El Dorado Solar, LLCSolar farms Β· 1.5 MW Β· 5.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem