United States › Power plants › Solar farms › California
SOLAR FARMSSCWA R5 Pond Solar
SCWA R5 Pond Solar is a 2.0 MW cancelled solar farm in Sonoma County, California, operated by Pristine Sun Fund 8, LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| SKYR5 | Solar Photovoltaic | 2.0 MW | Cancelled or postponed |
Plant details
- Operator
- Pristine Sun Fund 8, LLC
- Location
- Sonoma County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 2.0 MW
- EIA plant ID
- 61123
Location
38.2544, -122.4442
Nearby power plants
- Stage Gulch SolarSolar farms · 1.0 MW · 6.0 mi
- Ellis Creek SolarSolar farms · 4.0 MW · 7.4 mi
- Dynamo Solar LLCSolar farms · 24.5 MW · 8.4 mi
- Waste Mangement Redwood LFGTEBioenergy plants · 4.0 MW · 9.2 mi
- Soscol Ferry SolarSolar farms · 2.0 MW · 9.2 mi
- Kaiser Napa Valley Corporate Dr Fuel CelGas power plants · 4.8 MW · 9.3 mi
- Silveira Ranch Road SolarSolar farms · 3.0 MW · 9.6 mi
- Sutter Home Winery GIRSolar farms · 1.1 MW · 10.8 mi
- American Canyon RV Boat StorageSolar farms · 1.9 MW · 10.9 mi
- Cottonwood Solar, LLC Cottonwood CarportSolar farms · 1.0 MW · 10.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem