United States › Power plants › Nuclear power plants › Idaho
NUCLEAR POWER PLANTSUAMPS Carbon Free Power Plant
UAMPS Carbon Free Power Plant is a 762 MW cancelled nuclear power plant in Bonneville County, Idaho, operated by Utah Associated Mun Power Sys.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| NPM1 | Nuclear | 77 MW | Cancelled or postponed |
| NPM2 | Nuclear | 77 MW | Cancelled or postponed |
| NPM3 | Nuclear | 77 MW | Cancelled or postponed |
| NPM4 | Nuclear | 77 MW | Cancelled or postponed |
| NPM5 | Nuclear | 77 MW | Cancelled or postponed |
| NPM6 | Nuclear | 77 MW | Cancelled or postponed |
| NPM7 | Nuclear | 50 MW | Cancelled or postponed |
| NPM8 | Nuclear | 50 MW | Cancelled or postponed |
| NPM9 | Nuclear | 50 MW | Cancelled or postponed |
| NPM10 | Nuclear | 50 MW | Cancelled or postponed |
| NPM11 | Nuclear | 50 MW | Cancelled or postponed |
| NPM12 | Nuclear | 50 MW | Cancelled or postponed |
Plant details
- Operator
- Utah Associated Mun Power Sys
- Location
- Bonneville County, Idaho
- Balancing authority
- PACE
- Sector
- Electric Utility
- Capacity
- Cancelled: 762 MW
- EIA plant ID
- 61075
Location
43.5196, -112.0462
Nearby power plants
- City Power PlantHydroelectric plants · 8.0 MW · 1.9 mi
- Upper Power PlantHydroelectric plants · 8.0 MW · 2.3 mi
- Lower No 1Hydroelectric plants · 8.0 MW · 3.6 mi
- Lower No 2Hydroelectric plants · 3.0 MW · 3.6 mi
- Gem StateHydroelectric plants · 23.4 MW · 7.4 mi
- Goshen Phase IIWind farms · 125 MW · 11.1 mi
- Meadow Creek Project CompanyWind farms · 120 MW · 12.1 mi
- Wolverine CreekWind farms · 64.5 MW · 12.9 mi
- Cedar Creek Wind, LLCWind farms · 160 MW · 13.3 mi
- Kettle Butte Digester, LLCBioenergy plants · 1.8 MW · 14.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem