🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › Connecticut

SOLAR FARMS

CMEEC - Hollyhock Solar

CMEEC - Hollyhock Solar is a 6.0 MW cancelled solar farm in New London County, Connecticut, operated by Tesla Inc..

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in Connecticut

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
PV1Solar Photovoltaic6.0 MW Cancelled or postponed

Plant details

Operator
Tesla Inc.
Location
New London County, Connecticut
Balancing authority
ISNE
Sector
IPP Non-CHP
Capacity
Cancelled: 6.0 MW
EIA plant ID
60606

Location

41.5284, -72.0861

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem