United States › Power plants › Solar farms › Nevada
SOLAR FARMSBoulder Solar Power, LLC
Boulder Solar Power, LLC is a 100 MW operating solar farm in Clark County, Nevada, operated by Southern Power Co.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BSP | Solar Photovoltaic | 100 MW |
Plant details
- Operator
- Southern Power Co
- Location
- Clark County, Nevada
- Balancing authority
- NEVP
- Sector
- IPP Non-CHP
- Capacity
- Operating: 100 MW
- First unit online
- Dec 2016
- EIA plant ID
- 60352
Location
35.8340, -114.9700
Nearby power plants
- Boulder Solar III LLCSolar farms, Battery storage · 256 MW · 0.5 mi
- Techren Solar III LLCSolar farms · 25.0 MW · 0.7 mi
- Techren Solar I LLCSolar farms · 100 MW · 1.2 mi
- Silver PeakBattery storage · 279 MW · 1.3 mi
- Boulder Solar II, LLCSolar farms · 50.0 MW · 1.8 mi
- Roccasecca BESS LLCBattery storage · 127 MW · 2.4 mi
- Techren Solar II LLCSolar farms · 200 MW · 2.4 mi
- Nevada Solar OneSolar farms · 75.7 MW · 2.5 mi
- Boulder Flats SolarSolar farms · 113 MW · 3.2 mi
- Copper Mountain Solar 2Solar farms · 154 MW · 3.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem