United States › Power plants › Solar farms › Connecticut
SOLAR FARMSLebanon Solar 2
Lebanon Solar 2 is a 2.0 MW cancelled solar farm in New London County, Connecticut, operated by Windham Solar LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| LEB2 | Solar Photovoltaic | 2.0 MW | Cancelled or postponed |
Plant details
- Operator
- Windham Solar LLC
- Location
- New London County, Connecticut
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 2.0 MW
- EIA plant ID
- 59992
Location
41.6540, -72.1602
Nearby power plants
- Adams SolarSolar farms · 1.0 MW · 0.1 mi
- Wilson Solar (CT)Solar farms · 1.0 MW · 0.1 mi
- Franklin Solar (CT)Solar farms · 1.0 MW · 0.2 mi
- Jefferson Solar (CT)Solar farms · 1.0 MW · 0.2 mi
- Hamilton SolarSolar farms · 1.0 MW · 0.2 mi
- Scotland DamHydroelectric plants · 2.0 MW · 2.1 mi
- CMEEC - BozrahSolar farms · 2.5 MW · 5.8 mi
- CMEEC - Norwich Stott St Solar HybridSolar farms, Battery storage · 4.3 MW · 6.0 mi
- LNG 1 & 2Oil-fired power plants · 5.2 MW · 6.2 mi
- Fusion Solar Center LLCSolar farms · 20.0 MW · 6.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem