United States › Power plants › Solar farms › Massachusetts
SOLAR FARMSBlueWave Capital - Grafton (SREC II)
BlueWave Capital - Grafton (SREC II) is a 1.3 MW operating solar farm in Worcester County, Massachusetts, operated by TerraForm Solar XVII, LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Solar Photovoltaic | 1.3 MW |
Plant details
- Operator
- TerraForm Solar XVII, LLC
- Location
- Worcester County, Massachusetts
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
- Capacity
- Operating: 1.3 MW
- First unit online
- Mar 2015
- EIA plant ID
- 59752
Location
42.2255, -71.6627
Nearby power plants
- Grafton PVSolar farms · 2.7 MW · 0.0 mi
- DG Tufts Knoll LLC CSGSolar farms · 2.0 MW · 1.3 mi
- DG Tufts Science LLC CSGSolar farms · 1.0 MW · 1.5 mi
- Grafton SolarSolar farms · 1.5 MW · 2.0 mi
- Shrewsbury SolarSolar farms · 2.5 MW · 3.3 mi
- Westborough Solar LLCSolar farms · 1.8 MW · 3.8 mi
- Northbridge SolarSolar farms · 1.9 MW · 4.2 mi
- ShrewsburyOil-fired power plants · 14.0 MW · 4.4 mi
- Wheelabrator Millbury FacilityBioenergy plants · 47.6 MW · 5.3 mi
- Univ of Massachusetts Medical CenterGas power plants · 17.5 MW · 6.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem