United States › Power plants › Solar farms › North Carolina
SOLAR FARMSInnovative Solar 71
Innovative Solar 71 is a 5.0 MW cancelled solar farm in Columbus County, North Carolina, operated by Innovative Solar 71, LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| IS071 | Solar Photovoltaic | 5.0 MW | Cancelled or postponed |
Plant details
- Operator
- Innovative Solar 71, LLC
- Location
- Columbus County, North Carolina
- Balancing authority
- DUK
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 5.0 MW
- EIA plant ID
- 59680
Location
34.1323, -78.8545
Nearby power plants
- Arthur Solar, LLCSolar farms · 5.0 MW · 2.0 mi
- Beckwith SolarSolar farms · 5.0 MW · 2.5 mi
- Arthur 2 SolarSolar farms · 5.0 MW · 3.0 mi
- Dessie Solar Center LLCSolar farms · 4.8 MW · 11.8 mi
- Broadway Solar Center, LLCSolar farms · 5.0 MW · 12.3 mi
- Garrell Solar FarmSolar farms · 5.0 MW · 13.8 mi
- Chadbourn FarmSolar farms · 5.0 MW · 14.2 mi
- Hubble Solar, LLCSolar farms · 2.0 MW · 14.3 mi
- Mill Pond Solar Farm, LLCSolar farms · 5.0 MW · 14.9 mi
- Cathcart Solar, LLCSolar farms · 5.0 MW · 15.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem