United States › Power plants › Bioenergy plants › Georgia
BIOENERGY PLANTSPecan Row Landfill To Electric Facility
Pecan Row Landfill To Electric Facility is a 6.4 MW operating bioenergy plant in Lowndes County, Georgia, operated by Energy Developments, Inc d/b/a EDL.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GEN1 | Landfill Gas | 1.6 MW | |
| GEN2 | Landfill Gas | 1.6 MW | |
| GEN3 | Landfill Gas | 1.6 MW | |
| GM04 | Landfill Gas | 1.6 MW |
Plant details
- Operator
- Energy Developments, Inc d/b/a EDL
- Location
- Lowndes County, Georgia
- Balancing authority
- SOCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 6.4 MW
- First unit online
- Jun 1977
- EIA plant ID
- 59221
Location
30.8150, -83.3625
Nearby power plants
- South Georgia Medical Center IncOil-fired power plants · 5.5 MW · 5.4 mi
- Lowndes CowartSolar farms · 3.0 MW · 6.1 mi
- Valdosta PrisonSolar farms · 1.0 MW · 6.9 mi
- Valdosta (Terraform)Solar farms · 1.0 MW · 8.1 mi
- Lowndes IDASolar farms · 1.5 MW · 8.1 mi
- PCA-Valdosta MillBioenergy plants · 69.9 MW · 9.0 mi
- Valdosta Water Treatment PlantOil-fired power plants · 3.4 MW · 9.4 mi
- Moody Air Force Base SolarSolar farms, Battery storage · 99.0 MW · 12.9 mi
- Lowndes Tycor FarmsSolar farms · 2.3 MW · 14.5 mi
- Quitman SolarSolar farms · 150 MW · 16.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem