🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Hydroelectric plants › Pennsylvania

HYDROELECTRIC PLANTS

Braddock Lock and Dam

Braddock Lock and Dam is a 5.3 MW planned hydroelectric plant in Allegheny County, Pennsylvania, operated by Lock+ Hydro Friends Fund XLII, LLC.

Plant statusIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2027 (not yet reached)
  5. Closed (not yet reached)

Planned start of operation reported to EIA: Mar 2027.

Open in Google MapsMore hydroelectric plants in Pennsylvania

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
GEN1Conventional Hydroelectric5.3 MW Regulatory approvals pendingTarget Mar 2027

Plant details

Operator
Lock+ Hydro Friends Fund XLII, LLC
Location
Allegheny County, Pennsylvania
Balancing authority
PJM
Sector
IPP Non-CHP
Capacity
Planned: 5.3 MW
EIA plant ID
59091

Location

40.3889, -79.8589

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem