United States › Power plants › Wind farms › California
WIND FARMS · SOLAR FARMS4001 and 2510 ClearVista Solar and Wind
4001 and 2510 ClearVista Solar and Wind is a 24.5 MW cancelled power plant in Kern County, California, operated by ClearVista Energy LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| CVWT | Onshore Wind Turbine | 20 MW | Cancelled or postponed |
| CVPV | Solar Photovoltaic | 5.0 MW | Cancelled or postponed |
Plant details
- Operator
- ClearVista Energy LLC
- Location
- Kern County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 24.5 MW
- EIA plant ID
- 58922
Location
35.1064, -118.3928
Nearby power plants
- Helzel & Schwarzhoff 86Wind farms · 2.4 MW · 1.0 mi
- Terra-Gen VG Wind LLCWind farms · 7.4 MW · 1.0 mi
- ZCOWind farms · 1.6 MW · 2.1 mi
- Point WindWind farms · 64.5 MW · 2.5 mi
- Victory Garden (Tehachapi)Wind farms · 26.1 MW · 2.7 mi
- Alta Wind XIWind farms · 90.0 MW · 2.9 mi
- Tehachapi Wind Resource IWind farms · 8.7 MW · 3.2 mi
- 85 BWind farms · 25.2 MW · 3.4 mi
- Coram Energy LLCWind farms · 3.0 MW · 3.6 mi
- 85 AWind farms · 21.3 MW · 3.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem