United States › Power plants › Gas power plants › Pennsylvania
GAS POWER PLANTSHop Bottom
Hop Bottom is a 43.0 MW cancelled gas power plant in Susquehanna County, Pennsylvania, operated by Hop Bottom Energy LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Natural Gas Internal Combustion Engine | 7.0 MW | Cancelled or postponed |
| 2 | Natural Gas Internal Combustion Engine | 7.0 MW | Cancelled or postponed |
| 3 | Natural Gas Internal Combustion Engine | 7.0 MW | Cancelled or postponed |
| GEN1 | Natural Gas Internal Combustion Engine | 4.4 MW | Cancelled or postponed |
| GEN2 | Natural Gas Internal Combustion Engine | 4.4 MW | Cancelled or postponed |
| GEN3 | Natural Gas Internal Combustion Engine | 4.4 MW | Cancelled or postponed |
| GEN4 | Natural Gas Internal Combustion Engine | 4.4 MW | Cancelled or postponed |
| GEN5 | Natural Gas Internal Combustion Engine | 4.4 MW | Cancelled or postponed |
Plant details
- Operator
- Hop Bottom Energy LLC
- Location
- Susquehanna County, Pennsylvania
- Balancing authority
- PJM
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 43.0 MW
- EIA plant ID
- 58800
Location
41.6681, -75.7250
Nearby power plants
- Oxbow CreekGas power plants · 22.0 MW · 8.6 mi
- Blakely (PA) RTO BTMOil-fired power plants · 5.4 MW · 14.7 mi
- Archbald Power StationBioenergy plants, Gas power plants · 92.9 MW · 15.8 mi
- Waymart WindWind farms · 64.5 MW · 16.1 mi
- Lackawanna Energy CenterGas power plants · 1,499 MW · 16.5 mi
- RoundtopGas power plants · 22.0 MW · 16.7 mi
- Procter & Gamble Mehoopany MillGas power plants · 120 MW · 17.7 mi
- LL Scranton PASolar farms · 1.1 MW · 18.8 mi
- Mehoopany Wind Energy LLCWind farms · 141 MW · 23.9 mi
- Wolf Run EnergyGas power plants · 22.0 MW · 29.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem