United States › Power plants › Wind farms › Texas
WIND FARMSTX Hereford Wind
TX Hereford Wind is a 200 MW operating wind farm in Deaf Smith County, Texas, operated by Boralex US Operations LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 200 MW |
Plant details
- Operator
- Boralex US Operations LLC
- Location
- Deaf Smith County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 200 MW
- First unit online
- Dec 2014
- EIA plant ID
- 58773
Location
34.7481, -102.1744
Nearby power plants
- TX Jumbo Road WindWind farms · 300 MW · 4.9 mi
- Astra Wind FarmWind farms · 163 MW · 7.1 mi
- EasterWind farms · 152 MW · 11.5 mi
- Renegade Solar Project (Dawn)Solar farms · 515 MW · 12.6 mi
- Changing WindsWind farms · 288 MW · 17.7 mi
- Bethel Wind Farm LLCWind farms · 276 MW · 20.8 mi
- TX Nazareth SolarSolar farms · 201 MW · 21.3 mi
- Hornet Solar (TX)Solar farms · 600 MW · 21.5 mi
- Hornet Solar II (TX) (Hybrid)Solar farms, Battery storage · 400 MW · 21.7 mi
- Mariah del NorteWind farms · 230 MW · 23.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem