United States βΊ Power plants βΊ Solar farms βΊ North Carolina
SOLAR FARMSLotus Solar
Lotus Solar is a 4.0 MW cancelled solar farm in Guilford County, North Carolina, operated by Lotus Solar, LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV1 | Solar Photovoltaic | 4.0 MW | Cancelled or postponed |
Plant details
- Operator
- Lotus Solar, LLC
- Location
- Guilford County, North Carolina
- Balancing authority
- CPLE
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 4.0 MW
- EIA plant ID
- 58729
Location
36.1389, -79.5406
Nearby power plants
- LotusSolar farms Β· 4.0 MW Β· 0.2 mi
- FriedenBattery storage Β· 3.5 MW Β· 1.6 mi
- Manning PV 1Solar farms Β· 5.0 MW Β· 1.7 mi
- Facile SolarSolar farms Β· 2.0 MW Β· 3.8 mi
- Big BoySolar farms Β· 3.0 MW Β· 6.7 mi
- West River Solar, LLCSolar farms Β· 40.0 MW Β· 8.7 mi
- Husky SolarSolar farms Β· 5.0 MW Β· 10.2 mi
- Nick SolarSolar farms Β· 5.0 MW Β· 10.2 mi
- White Street RenewablesBioenergy plants, Solar farms Β· 5.0 MW Β· 10.5 mi
- Milo SolarSolar farms Β· 3.0 MW Β· 10.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem