πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms β€Ί Arizona

SOLAR FARMS

Dry Lake Solar

Dry Lake Solar is a 50.0 MW cancelled solar farm in Navajo County, Arizona, operated by Avangrid Power LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in Arizona

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Solar Photovoltaic50 MW Cancelled or postponed

Plant details

Operator
Avangrid Power LLC
Location
Navajo County, Arizona
Balancing authority
AZPS
Sector
IPP Non-CHP
Capacity
Cancelled: 50.0 MW
EIA plant ID
57922

Location

34.5133, -110.0783

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem