United States › Power plants › Solar farms › California
SOLAR FARMSIndustry MetroLink PV 1
Industry MetroLink PV 1 is a 1.5 MW operating solar farm in Los Angeles County, California, operated by City of Industry - (CA).
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Solar Photovoltaic | 1.5 MW |
Plant details
- Operator
- City of Industry - (CA)
- Location
- Los Angeles County, California
- Balancing authority
- CISO
- Sector
- Electric Utility
- Capacity
- Operating: 1.5 MW
- First unit online
- Apr 2012
- EIA plant ID
- 57860
Location
34.0087, -117.8456
Nearby power plants
- Walnut Unified School District Walnut HSSolar farms, Battery storage · 2.3 MW · 1.0 mi
- MM West CovinaBioenergy plants · 6.8 MW · 3.9 mi
- Blacksand Generating FacilityGas power plants · 9.6 MW · 5.3 mi
- Brea Expansion PlantBioenergy plants · 35.7 MW · 5.3 mi
- VESI PomonaBattery storage · 40.0 MW · 5.4 mi
- Walnut Creek Energy ParkGas power plants · 500 MW · 5.7 mi
- Yorba LindaHydroelectric plants · 5.1 MW · 6.9 mi
- Gilead Sciences La Verne Rooftop SolarSolar farms, Battery storage · 2.8 MW · 7.1 mi
- Valley ViewHydroelectric plants · 4.1 MW · 7.6 mi
- Weymouth Solar PlantSolar farms · 3.0 MW · 7.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem