🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Wind farms › Utah

WIND FARMS

Milford Wind Corridor Phase III

Milford Wind Corridor Phase III is a 100 MW cancelled wind farm in Beaver County, Utah, operated by Milford Wind Corridor Phase III, LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore wind farms in Utah

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Onshore Wind Turbine100 MW Cancelled or postponed

Plant details

Operator
Milford Wind Corridor Phase III, LLC
Location
Beaver County, Utah
Balancing authority
PACE
Sector
IPP Non-CHP
Capacity
Cancelled: 100 MW
EIA plant ID
57546

Location

38.3969, -113.0108

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem