United States › Power plants › Solar farms › California
SOLAR FARMSSolar Photovoltaic Project #46
Solar Photovoltaic Project #46 is a 3.5 MW cancelled solar farm in Kern County, California, operated by Southern California Edison Co.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| S46A | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S46B | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S46C | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S46D | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S46E | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S46F | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
| S46G | Solar Photovoltaic | 0.5 MW | Cancelled or postponed |
Plant details
- Operator
- Southern California Edison Co
- Location
- Kern County, California
- Balancing authority
- CISO
- Sector
- Electric Utility
- Capacity
- Cancelled: 3.5 MW
- EIA plant ID
- 57545
Location
35.7439, -119.2294
Nearby power plants
- Wonderful Citrus - DelanoSolar farms · 2.8 MW · 0.7 mi
- Delano Energy CenterGas power plants · 60.5 MW · 4.9 mi
- Kern Valley SPSolar farms · 3.0 MW · 4.9 mi
- North Kern State Prison Phase IISolar farms · 4.0 MW · 5.1 mi
- Delano Land 1Solar farms · 1.0 MW · 6.6 mi
- Castle Rock VineyardsSolar farms · 1.0 MW · 7.7 mi
- Ranch 4701Solar farms · 2.3 MW · 8.3 mi
- BlankenshipSolar farms · 1.0 MW · 9.0 mi
- Bottleneck Energy StorageBattery storage · 80.0 MW · 10.2 mi
- Inland EmpireSolar farms · 1.8 MW · 10.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem