United States › Power plants › Solar farms › California

SOLAR FARMS

Solar Photovoltaic Project #41

Solar Photovoltaic Project #41 is a 10.0 MW cancelled solar farm in San Bernardino County, California, operated by Southern California Edison Co.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
S41ASolar Photovoltaic0.5 MW Cancelled or postponed
S41BSolar Photovoltaic0.5 MW Cancelled or postponed
S41CSolar Photovoltaic0.5 MW Cancelled or postponed
S41DSolar Photovoltaic0.5 MW Cancelled or postponed
S41ESolar Photovoltaic0.5 MW Cancelled or postponed
S41FSolar Photovoltaic0.5 MW Cancelled or postponed
S41GSolar Photovoltaic0.5 MW Cancelled or postponed
S41HSolar Photovoltaic0.5 MW Cancelled or postponed
S41ISolar Photovoltaic0.5 MW Cancelled or postponed
S41JSolar Photovoltaic0.5 MW Cancelled or postponed
S41KSolar Photovoltaic0.5 MW Cancelled or postponed
S41LSolar Photovoltaic0.5 MW Cancelled or postponed
S41MSolar Photovoltaic0.5 MW Cancelled or postponed
S41NSolar Photovoltaic0.5 MW Cancelled or postponed
S41OSolar Photovoltaic0.5 MW Cancelled or postponed
S41PSolar Photovoltaic0.5 MW Cancelled or postponed
S41QSolar Photovoltaic0.5 MW Cancelled or postponed
S41RSolar Photovoltaic0.5 MW Cancelled or postponed
S41SSolar Photovoltaic0.5 MW Cancelled or postponed
S41TSolar Photovoltaic0.5 MW Cancelled or postponed

Plant details

Operator
Southern California Edison Co
Location
San Bernardino County, California
Balancing authority
CISO
Sector
Electric Utility
Capacity
Cancelled: 10.0 MW
EIA plant ID
57539

Location

34.8556, -116.8669

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem