🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › California

SOLAR FARMS

Solar Photovoltaic Project #40

Solar Photovoltaic Project #40 is a 10.0 MW cancelled solar farm in San Bernardino County, California, operated by Southern California Edison Co.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
S40ASolar Photovoltaic0.5 MW Cancelled or postponed
S40BSolar Photovoltaic0.5 MW Cancelled or postponed
S40CSolar Photovoltaic0.5 MW Cancelled or postponed
S40DSolar Photovoltaic0.5 MW Cancelled or postponed
S40ESolar Photovoltaic0.5 MW Cancelled or postponed
S40FSolar Photovoltaic0.5 MW Cancelled or postponed
S40GSolar Photovoltaic0.5 MW Cancelled or postponed
S40HSolar Photovoltaic0.5 MW Cancelled or postponed
S40ISolar Photovoltaic0.5 MW Cancelled or postponed
S40JSolar Photovoltaic0.5 MW Cancelled or postponed
S40KSolar Photovoltaic0.5 MW Cancelled or postponed
S40LSolar Photovoltaic0.5 MW Cancelled or postponed
S40MSolar Photovoltaic0.5 MW Cancelled or postponed
S40NSolar Photovoltaic0.5 MW Cancelled or postponed
S40OSolar Photovoltaic0.5 MW Cancelled or postponed
S40PSolar Photovoltaic0.5 MW Cancelled or postponed
S40QSolar Photovoltaic0.5 MW Cancelled or postponed
S40RSolar Photovoltaic0.5 MW Cancelled or postponed
S40SSolar Photovoltaic0.5 MW Cancelled or postponed
S40TSolar Photovoltaic0.5 MW Cancelled or postponed

Plant details

Operator
Southern California Edison Co
Location
San Bernardino County, California
Balancing authority
CISO
Sector
Electric Utility
Capacity
Cancelled: 10.0 MW
EIA plant ID
57538

Location

34.8556, -116.8669

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem