United States βΊ Power plants βΊ Wind farms βΊ Idaho
WIND FARMSChapin Mountain
Chapin Mountain is a 19.5 MW cancelled wind farm in Cassia County, Idaho, operated by Exergy Development Group.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| CM | Onshore Wind Turbine | 20 MW | Cancelled or postponed |
Plant details
- Operator
- Exergy Development Group
- Location
- Cassia County, Idaho
- Balancing authority
- IPCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 19.5 MW
- EIA plant ID
- 57142
Location
42.5656, -113.5214
Nearby power plants
- MinidokaHydroelectric plants Β· 27.7 MW Β· 7.5 mi
- Burley Butte WindparkWind farms Β· 21.3 MW Β· 21.3 mi
- Golden Valley Wind Park LLCWind farms Β· 12.0 MW Β· 22.4 mi
- Milner Butte LFGEBioenergy plants Β· 3.9 MW Β· 25.5 mi
- Milner Dam Wind Park LLCWind farms Β· 19.5 MW Β· 26.3 mi
- Milner HydroHydroelectric plants Β· 59.5 MW Β· 26.4 mi
- BypassHydroelectric plants Β· 9.9 MW Β· 27.3 mi
- S E Hazelton AHydroelectric plants Β· 8.7 MW Β· 27.8 mi
- Hazelton B HydroHydroelectric plants Β· 7.6 MW Β· 29.2 mi
- Rockland Wind FarmWind farms Β· 79.2 MW Β· 32.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem