United States › Power plants › Wind farms › New Mexico
WIND FARMSAragonne Mesa Phase II
Aragonne Mesa Phase II is a 105 MW cancelled wind farm in Guadalupe County, New Mexico, operated by Pattern Operators LP.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 105 MW | Cancelled or postponed |
Plant details
- Operator
- Pattern Operators LP
- Location
- Guadalupe County, New Mexico
- Balancing authority
- PNM
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 105 MW
- EIA plant ID
- 56656
Location
34.8428, -104.9761
Nearby power plants
- Aragonne Wind LLCWind farms · 235 MW · 2.8 mi
- El Cabo WindWind farms · 298 MW · 30.6 mi
- Tecolote Wind LLCWind farms · 272 MW · 42.5 mi
- Clines Corners Wind Farm LLCWind farms · 325 MW · 42.6 mi
- Duran Mesa LLCWind farms · 105 MW · 42.9 mi
- La Joya NMWind farms · 306 MW · 43.4 mi
- Red Cloud Wind LLCWind farms · 350 MW · 46.8 mi
- SunZia Wind SouthWind farms · 2,561 MW · 48.8 mi
- SunZia Wind NorthWind farms · 1,089 MW · 48.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem