United States › Power plants › Wind farms › Texas
WIND FARMSSweetwater Wind 5
Sweetwater Wind 5 is a 80.5 MW operating wind farm in Nolan County, Texas, operated by Leeward Asset Management, LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| SW5 | Onshore Wind Turbine | 81 MW |
Plant details
- Operator
- Leeward Asset Management, LLC
- Location
- Nolan County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 80.5 MW
- First unit online
- Dec 2007
- EIA plant ID
- 56372
Location
32.2369, -100.4833
Nearby power plants
- Maryneal WindpowerWind farms · 182 MW · 2.6 mi
- Sweetwater Wind 3 LLCWind farms · 135 MW · 5.2 mi
- Sweetwater Wind 4 LLCWind farms · 241 MW · 5.9 mi
- Mesquite StarWind farms · 419 MW · 9.6 mi
- Sweetwater Wind 2 LLCWind farms · 98.8 MW · 10.1 mi
- Sweetwater Wind 1 LLCWind farms · 37.5 MW · 12.0 mi
- Turkey Track Wind Energy LLCWind farms · 170 MW · 12.8 mi
- Champion Wind Farm LLCWind farms · 127 MW · 14.7 mi
- Sweetwater BESSBattery storage · 10.0 MW · 15.4 mi
- Lone Wolfe Phase OneSolar farms · 1.1 MW · 17.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem