United States › Power plants › Bioenergy plants › Wisconsin
BIOENERGY PLANTSLake Area Landfill Gas Recovery
Lake Area Landfill Gas Recovery is a 3.8 MW cancelled bioenergy plant in Washburn County, Wisconsin, operated by Dairyland Power Coop.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 1 | Landfill Gas | 1.0 MW | Cancelled or postponed |
| 2 | Landfill Gas | 1.0 MW | Cancelled or postponed |
| 3 | Landfill Gas | 1.0 MW | Cancelled or postponed |
| 4 | Landfill Gas | 0.8 MW | Cancelled or postponed |
Plant details
- Operator
- Dairyland Power Coop
- Location
- Washburn County, Wisconsin
- Balancing authority
- MISO
- Sector
- Electric Utility
- Capacity
- Cancelled: 3.8 MW
- EIA plant ID
- 56366
Location
45.8383, -91.6919
Nearby power plants
- SpoonerSolar farms · 2.3 MW · 8.3 mi
- Spooner Solar ArraySolar farms · 2.0 MW · 9.9 mi
- TregoHydroelectric plants · 1.2 MW · 12.1 mi
- Rice Lake Solar ArraySolar farms · 3.8 MW · 21.8 mi
- Rice Lake IISolar farms · 2.8 MW · 21.8 mi
- Arpin DamHydroelectric plants · 1.4 MW · 24.3 mi
- Cumberland (WI)Gas power plants, Oil-fired power plants · 21.2 MW · 26.4 mi
- ViolaSolar farms · 2.5 MW · 27.6 mi
- Cumberland SolarSolar farms · 2.5 MW · 27.8 mi
- GordonOil-fired power plants · 7.0 MW · 27.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem